Developer: Trizec Hahn Office Properties
Architect: The Cohos Evamy Partners Architects

After the success of Phase I, which included the east office tower, and a six storey podium, which was designed to support a second high rise office tower, the Owner decided in 1997 to construct the second phase west tower of the Bankers Hall project.

Structural steel grillages were erected, at the sixth level roof, of the podium, to support two climbing cranes, that would be employed to construct the second office tower, and to initially transfer the loads imposed by these cranes to the existing building columns below.

At the top of the sixth level framing, vertical reinforcing steel bars projected above the top surface of the structure, to enable mechanical splices to be employed to connect the next tier of vertical reinforcing steel in the walls and columns from the sixth to the seventh floors.

The same framing system was employed for the floors of the west tower, as had been proven to work so efficiently in the east tower. The system employed, haunched reinforced concrete girders, typically, at nine metres on centre, spanning twelve metres from the perimeter columns to the central core. Between the perimeter reinforced concrete spandrel beams and the central reinforced concrete core, there are two parallel lines of reinforced concrete purlins, spanning between the haunched beams, which support the 130 mm thick one-way reinforced concrete floor slabs.

Above the fiftieth floor, which is the mechanical level, the sloping roof, which extends up to a concrete ring beam, above the fifty-second level, is framed in structural steel, and encloses the four cooling towers with a special metal roof cladding system. Inside of the structural steel roof enclosure, concrete columns extend up to support mechanical mezzanines at the fifty-first and fifty-second levels and the reinforced concrete ring beam above same.

To satisfy the loads in the columns, being brought to bear by fifty-two levels of reinforced concrete framing, the concrete strengths in the columns ranged from 80 megapascals at 120 days below the thirty-third level, to 65 megapascals at 120 days from the thirty-third to the thirty-sixth level, to 50 megapascals at 120 days from the thirty-seventh to the thirty-ninth levels and so on down to 30 megapascals at 28 days above the forty-third level.

Wind affects are the controlling lateral forces, acting on the structure, and are resisted entirely by the central core, in the north-south direction. However, in the east-west direction, the lateral wind forces are resisted by the interaction of the frames, comprised of the spandrel beams, and close spaced columns, on the north and south elevations, with the central core.

By Dave 06 May, 2011
This multi purpose project, located in Toronto, at the north-west corner of King and John Streets is home to the Toronto International Film Festival which has its offices on the fourth, fifth and sixth floors...
By Dave 04 May, 2011
This world class residential condominium, with retail spaces on the first and second levels, is located at the south-east corner of Yonge and Bloor Streets close to Toronto’s fashionable shopping district.
By Dave 03 May, 2011
This multi purpose project, located in Toronto, at the north-west corner of King and John Streets is home to the Toronto International Film Festival which has its offices on the fourth, fifth and sixth floors...
By Dave 02 May, 2011
This sixty-two storey, residential, condominium is constructed over three basement levels, at the north-east corner of the intersection of Yonge Street and The Esplanade.
By Dave 02 May, 2011
This condominium lofts residence is comprised of three components, in a former industrial area of the City of Toronto, west of the downtown, which is being revitalized as a residential community.
By Dave 30 Apr, 2011
The project, consisting of two high-rise residential condominium towers, and future office tower, is located on the west side of York Street, between Brenner Boulevard and Gardiner/Lakeshore Boulevard.
By Dave 29 Apr, 2011
The first phase of this residential condominium project, composed of a twelve storey block and a fourteen storey block, linked by a three storey space bridge truss component, containing three levels of condominium residences...
By Dave 28 Apr, 2011
This four storey up scale condominium, designed to resemble a palatial French chateau, is located at the south-east corner of Bayview Avenue and Post Road, in Toronto.
By Dave 27 Apr, 2011
This residential complex, composed of three, three storey townhouse blocks, with private elevators, and roof terraces, a forty-six storey west tower, and a fifty-six storey east tower is located at the west side of Bay Street...
By Dave 26 Apr, 2011
This condominium project, located at the south-east corner of the intersection of Mill and Parliament Streets, in the redeveloping distillery district of Toronto, is comprised of a nine storey podium...