This mixed use development consists of four hotel levels, with retail space on the ground floor, and five levels of private residences, above the hotel, all constructed over four levels...
By Dave 24 Feb, 2011
The hotel was built in 1972 and 1973 and was originally the Downtown London Holiday Inn. As part of the London City Centre Project it is a reinforced concrete structure constructed over a two level subgrade parking garage.
By Dave 24 Feb, 2011
The 4,000 plus pieces of granite and sandstone masonry were stacked the length of a city block before cleaning and reconditioning. They have now been returned to their former position and glory.
By Dave 24 Feb, 2011
The first stage was constructed of prefabricated, factory cast precast concrete room size box units. These were transported to the site and erected on top of a two storey high reinforced concrete transfer structure.