
EMPRESS WALK
This mixed-use development on the east side of Yonge Street, adjacent to the Yonge Street subway, in the North York district of Toronto, was completed in 2001.
Read more
BELL MOBILITY CENTRE & BELL CANADA CAMPUS
This innovative project, consisting of three low-rise office blocks, joined at the ground floor, and a three storey call centre, all constructed over two levels of a subgrade parking garage…
Read more
HULLMARK CENTRE
This mixed use development is located at the south-east corner of Yonge Street and Sheppard Avenue, adjacent to the Yonge and Sheppard subway tunnels connection.
Read more
ONE FINANCIAL PLACE
This thirty storey office building, with two additional mechanical penthouse levels, located at the south-east corner of the intersection of Yonge and Adelaide Streets, in downtown Toronto was completed in 1990.
Read more
ATI TECHNOLOGIES INC.
This suburban corporate office complex, located in Richmond Hill, Ontario, was completed in 2001. It is a four storey reinforced concrete structure, constructed over two subgrade vehicular parking levels.
Read more
FILMPORT – PHASE I COMPLEX
The project site, on the south side of Commissioners Street, at the east side of the Don Roadway, borders on a shipping channel of Lake Ontario, and has been planned to accommodate more than thirty sound stages.
Read more
THE MANULIFE CENTRE-TORONTO
This was one of the first multi use complexes built in downtown Toronto, combining a fifty-one storey residential tower, and a nineteen storey office block, over a three level shopping centre, with a three level subgrade parking garage underlying the entire complex.
Read more
BANKERS HALL PHASE II
After the success of Phase I, which included the east office tower, and a six storey podium, which was designed to support a second high rise office tower, the Owner decided…
Read more
POLO PARK SHOPPING CENTRE WINNIPEG
With the successful completion of the Pointe Claire Centre, the developer decided upon a vertical expansion for the Polo Park Shopping Centre, in Winnipeg. Here too, the primary criterion was to keep the centre in operation throughout…
Read more
THE MADISON CENTRE NORTH YORK
This prestige 32 storey tall condominium tower residence is part of the Madison Centre, in the core of North York. The superstructure is composed of unbonded post-tensioned concrete one-way slabs spanning 11 metres, between supporting shear walls.
Read more
THE ATRIUM ON BAY–TORONTO
This exciting complex of prestige offices, and a two level shopping centre, constructed in three blocks, ranging in height from eight to fourteen storeys, is arranged on the north and south sides of a central east-west atrium space. A two level subgrade parking garage occupies the entire site below the lower shopping level.
Read more
THE PARK LANE PROJECT HALIFAX
This multi use development is unique, not only in Halifax, but in the Atlantic Canada region. It contains a three level specialty shopping centre with eight cinemas and a food fair, on the lowest subgrade level.
Read more
NATIONAL BANK BUILDING – TORONTO
Developer: Oxford Developments Limited Architect: Pellow Architect Inc. This reinforced concrete office block, located at the north-west corner of York and Adelaide Streets was one of the first office buildings in downtown Toronto to employ flat slabs with modified drop panels, at the heads of the columns, as developed by this office in the mid-seventies. This office […]
Read more
THE YONGE EGLINTON CENTRE TORONTO
The complex incorporates two apartment blocks, two office towers and a three level shopping centre over a two level subgrade parking garage at the north-west corner of Toronto’s Yonge Street and Eglinton Avenue.
Read more
BANKERS HALL CALGARY
The first tower of the Bankers Hall project was topped off on June 26, 1989. The post modern architectural expression of the project employs an optimized reinforced concrete frame with a clear span of 12 metres from the perimeter columns to the central core.K
Read more