Archive for March, 2011
THE MANULIFE CENTRE-TORONTO
This was one of the first multi use complexes built in downtown Toronto, combining a fifty-one storey residential tower, and a nineteen storey office block, over a three level shopping centre, with a three level subgrade parking garage underlying the entire complex.
Read moreONE ST. THOMAS RESIDENCES
This thirty-one storey ultra high end residential condominium project, also includes four high end townhouses, each with its own private elevator. It is located close to the trendy part of Bloor Street in downtown Toronto.
Read more33 & 55 HARBOUR SQUARE CONDOMINIUMS TORONTO
The first and second phases were constructed between 1970 and 1977. The cranked shapes of the plans of the two towers at the edge of Lake Ontario presented a special wind analysis problem, which had to be solved, before the reinforced concrete slabs and shear walls of the structural could be designed.
Read moreBANKERS HALL PHASE II
After the success of Phase I, which included the east office tower, and a six storey podium, which was designed to support a second high rise office tower, the Owner decided…
Read moreATRIUM ON BAY MEDIA TOWER
This is the first of the electronic billboard structures to be constructed at the intersection of Yonge and Dundas Streets in downtown Toronto,
Read more