Archive for February, 2011
BANKERS HALL CALGARY
The first tower of the Bankers Hall project was topped off on June 26, 1989. The post modern architectural expression of the project employs an optimized reinforced concrete frame with a clear span of 12 metres from the perimeter columns to the central core.K
Read moreHOLIDAY INN–AIRPORT TORONTO
The first stage was constructed of prefabricated, factory cast precast concrete room size box units. These were transported to the site and erected on top of a two storey high reinforced concrete transfer structure.
Read moreTHE PROMENADE SHOPPING CENTRE VAUGHAN
A regional shopping centre at Highway 7 and Bathurst Street in the Town of Vaughan, north of Toronto, was completed in 1986, after having first been designed as a structural steel structure, which was subsequently changed to a reinforced concrete structural frame, to reduce the construction period by six months.
Read more2 BLOOR STREET EAST TORONTO
This multi use project in downtown Toronto, combines an office tower, an apartment hotel, a major department store, and a shopping centre, with an above grade and a subgrade parking facility.
Read more